Occupation · SOC 47-2042
Floor Layers, Except Carpet, Wood, and Hard Tiles
Apply blocks, strips, or sheets of shock-absorbing, sound-deadening, or decorative coverings to floors.
Median wage
$54,340
$37,190–$97,180
Projected growth
—
—
Annual openings
—
per year
Employed (US)
24,850
Job Zone 2
Typical preparation
Some preparation
Stackable credential programs
5 mapped
Core skills
Active ListeningSpeaking
Knowledge areas
Building and ConstructionCustomer and Personal ServiceMathematicsMechanicalProduction and Processing
Technology & tools
Data base user interface and query softwareProject management softwareWeb page creation and editing softwareOffice suite softwareComputer aided design CAD software
Representative tasks
Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.Cut flooring material to fit around obstructions.Inspect surface to be covered to ensure that it is firm and dry.Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.Measure and mark guidelines on surfaces or foundations, using chalk lines and dividers.Cut covering and foundation materials, according to blueprints and sketches.Apply adhesive cement to floor or wall material to join and adhere foundation material.Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.Determine traffic areas and decide location of seams.Lay out, position, and apply shock-absorbing, sound-deadening, or decorative coverings to floors, walls, and cabinets, following guidelines to keep courses straight and create designs.Remove excess cement to clean finished surface.Disconnect and remove appliances, light fixtures, and worn floor and wall covering from floors, walls, and cabinets.Heat and soften floor covering materials to patch cracks or fit floor coverings around irregular surfaces, using blowtorch.
Competency framework
Skill expectations by proficiency level.
emerging
Base surface inspection — identify firmness and moisture issues under direct supervision before floor covering installation begins.Surface preparation tools — sweep, scrape, and sand dirt and irregularities from subfloor surfaces following a lead installer's instructions.Chalk lines and dividers — mark basic guidelines on floor surfaces under close direction on a residential job site.Plywood and Masonite underlayment — staple panels to subfloor surfaces to create a smooth foundation with guidance from a journeyman.Sheet floor covering — assist in rolling and pressing material into cement base using a hand roller under direct supervision.Excess covering material — trim edges along walls and doorways using a utility knife following demonstrated techniques.Flooring measurement basics — take and record room dimensions using a tape measure with oversight on entry-level installation projects.Crack and pore filling — apply putty, plaster, or grout to minor surface imperfections following step-by-step instruction from a lead layer.Job site safety protocols — recognize and follow hazard-awareness procedures on active construction floors as directed by a supervisor.Hand tools and basic cutting equipment — identify and handle floor-laying tools correctly during orientation and early on-the-job training.
developing
Subfloor surfaces — inspect for firmness, dryness, and levelness without close oversight before beginning routine residential installations.Dirt, irregularities, and imperfections — clean and correct base surfaces independently using scrapers, sanders, and chipping tools on standard projects.Covering materials — cut sheet vinyl and resilient flooring around obstructions and irregular shapes using blueprints and field sketches.Waterproof compound and filler materials — apply and smooth foundation coatings and crack fillers to seal subfloor pores on commercial job sites.Chalk line layouts — measure and mark accurate guidelines and reference points on floors for consistent pattern alignment across a room.Sheet wall and floor covering — roll and press material into cement base with a hand roller to achieve a smooth, bubble-free finish.Covering section joints — trim excess material and join sections to form tight seams, tacking edges securely on mid-size installation projects.Inventory tracking — use inventory management software to verify material quantities and record usage on multi-room flooring projects.Customer communication — explain installation timelines and preparation requirements to homeowners or site contacts using clear, respectful language.Material waste reduction — cut foundation and covering materials efficiently from measured layouts to minimize scrap on routine assignments.
proficient
Complex subfloor conditions — diagnose and correct moisture, deflection, and unevenness issues autonomously before covering installation on large commercial projects.Non-standard obstructions — cut and fit resilient sheet flooring around pipes, columns, and irregular architectural features without assistance.Full installation scope — execute complete floor-laying projects from surface prep through final trim and seam joining across diverse substrate types.Blueprint and sketch interpretation — translate detailed architectural drawings into precise cutting layouts and material placement plans on demanding job sites.Foundation smoothing systems — select and apply the appropriate underlayment method or waterproof compound system for varied subfloor conditions.Pattern alignment and joint quality — achieve tight, visually consistent seams and accurate pattern registration across large open floor areas.Non-routine surface defects — troubleshoot and remediate unexpected subfloor irregularities that would telegraph through finished floor coverings.Project material planning — calculate coverage requirements and prepare material orders using project management or CAD software for multi-phase jobs.Quality control inspection — evaluate finished floor installations against industry standards and client specifications, identifying and correcting deficiencies.Tool and equipment maintenance — service hand rollers, cutters, and surface-preparation equipment to sustain peak performance across ongoing projects.
advanced
Installation standards and best practices — establish worksite quality benchmarks and mentor apprentices in correct surface preparation and covering techniques.Project workflow planning — develop sequenced installation schedules for large commercial or multi-unit projects using project management software and site logistics knowledge.Crew performance and development — coach and evaluate floor-laying teams, identifying skill gaps and assigning progressive tasks to accelerate competency growth.Difficult substrate systems — lead diagnosis and remediation of complex subfloor failures, selecting engineered solutions that protect long-term covering performance.Client and contractor relationships — communicate project scope, material selections, and timeline adjustments to general contractors and facility managers at a professional level.Material specification and procurement — advise on covering and underlayment product selection based on durability, budget, and design requirements for high-value projects.Safety and compliance leadership — implement and enforce job-site hazard controls and regulatory compliance standards across all crew members and subcontractors.Cost estimation and resource control — produce accurate labor and material cost estimates and monitor project budgets to ensure profitable delivery of flooring contracts.Continuous improvement culture — introduce refined cutting layouts, adhesive application methods, and seam techniques that raise installation quality across the organization.Organizational knowledge transfer — document standard operating procedures and training resources that preserve institutional expertise and onboard new floor layers efficiently.
Also known as
53 alternate job titles map to this occupation.
Tile InstallerFlooring Technician (Flooring Tech)TilerLinoleum InstallerFlooring ContractorFloor-Covering LayerPlastic Tile SetterTile FitterBuilder (Navy 002594)Tile ApplicatorFlooring MechanicVinyl InstallerLaminate Floor InstallerAsphalt Tile Floor LayerFloor InstallerFloor Coverings InstallerStructural (Air Force 3E3X1)Linoleum MechanicTile SetterResilient Tile InstallerEpoxy InstallerTile MechanicComposition Floor SetterBuilder (Navy BU)InstallerStructural Craftsman (Air Force 3E371)Shock Absorption Floor LayerFloor LayerStructural Journeyman (Air Force 3E351)Floor Technician (Floor Tech)Composition Tile LayerTile TrimmerLinoleum Floor InstallerFloor Covering InstallerSoft-Tile SetterLinoleum Tile LayerFlooring InstallerRubber Tile Floor LayerFloor Cover LayerStructural Apprentice (Air Force 3E331)