Occupation · SOC 47-2082
Tapers
Seal joints between plasterboard or other wallboard to prepare wall surface for painting or papering.
Median wage
$64,700
$43,450–$106,160
Projected growth
—
—
Annual openings
—
per year
Employed (US)
12,500
Job Zone 2
Typical preparation
Some preparation
Stackable credential programs
0 mapped
Core skills
Active ListeningSpeakingMonitoringTime ManagementCritical ThinkingSocial PerceptivenessCoordinationJudgment and Decision Making
Knowledge areas
Building and Construction
Technology & tools
Accounting softwareProject management softwareEnterprise resource planning ERP softwareOffice suite software
Representative tasks
Spread sealing compound between boards or panels or over cracks, holes, nail heads, or screw heads, Press paper tape over joints to embed tape into sealing compound and to seal joints.Apply additional coats to fill in holes and make surfaces smooth.
Competency framework
Skill expectations by proficiency level.
emerging
Sealing compound — apply to nail heads, screw heads, and small cracks using a broadknife under direct supervisor guidance on a residential construction site.Paper tape — press by hand over drywall joints to embed into fresh compound while following step-by-step instructions from a lead taper.Compound consistency — recognize acceptable mixing results when assisting with hand-mixed or electric-mixer batches under direct supervision on a job site.Joint tape — identify and select appropriate tape width and type for standard interior wall joints when directed by a journeyman taper.Plasterboard surfaces — sand lightly over minor nicks and shallow cracks using hand-held sandpaper following demonstrated methods on a new-construction site.Basic trowel and spatula — handle and clean properly at the end of each shift to maintain tools in working condition on a commercial build site.Scaffold and stilts safety — follow established safety protocols when accessing high ceilings under direct supervision on a multi-story residential project.Work schedule — report to assigned areas on time and complete delegated tasks within expected timeframes under close foreman oversight.Verbal instructions — listen attentively and confirm understanding when receiving task assignments from a lead taper on a busy job site.Surface defects — identify visible holes, cracks, and uneven spots in wallboard to flag for correction under the guidance of a journeyman taper.
developing
Sealing compound — spread and feather smoothly over joints, nail dimples, and screw heads using a broadknife or trowel with minimal oversight on a mid-size residential project.Paper tape — embed consistently into first-coat compound across full wall and ceiling runs, adjusting pressure to prevent bubbles on standard interior surfaces.Multi-coat finishing — apply second and third coats of compound to achieve progressively smoother surfaces, blending joints with surrounding wallboard on routine jobs.Floating machine — operate to spread and smooth cementing material over taped joints on large flat ceiling or wall sections during a commercial interior fit-out.Compound mixing — prepare hand-mixed and power-mixed batches to correct working consistency independently, adjusting water ratios based on temperature and humidity on site.Patching and sanding — patch nicks, cracks, and minor damage in plasterboard and sand to a paint-ready finish without supervision on established residential remodel projects.Scaffolding and stilts — set up and work safely at elevated heights on high ceilings, adjusting scaffold height to maintain efficient reach during a multi-room taping job.Time management — sequence taping, coating, and drying cycles across multiple rooms to meet project milestones without compromising finish quality on occupied renovation sites.Joint sealing — seal all joints between plasterboard panels completely, inspecting own work for voids or lifting tape before handoff to finishing or painting crews.Tool care and inventory — clean, maintain, and store trowels, broadknives, and mixing equipment at the end of each day to ensure readiness for the next shift.
proficient
Full-scope taping — execute all phases from taping through final coat independently across diverse wall and ceiling configurations on large commercial or residential projects.Surface leveling — blend compound seamlessly over joints and repairs using trowels and floating machines so that finished surfaces require no additional skimming before painting.Complex repairs — diagnose and patch structural cracks, water-damaged sections, and failed tape on existing plasterboard walls while recommending corrective measures to the project supervisor.Elevated surface finishing — work proficiently on stilts and multi-level scaffolding to tape and finish high ceilings and cathedral walls, maintaining quality and safety standards without oversight.Compound selection — choose the correct compound type, setting time, and mixing ratio for varying environmental conditions including high humidity, cold temperatures, or fast-track schedules.Critical inspection — evaluate finished joint work against industry flatness standards, identify deficiencies, and perform corrective passes before surfaces are handed off to painting crews.Crew coordination — communicate task priorities and sequencing clearly to apprentices and helpers, ensuring drying cycles and finishing schedules align across multiple concurrent work areas.Problem-solving on site — adapt taping and finishing methods when encountering non-standard board thickness, curved surfaces, or unusual corner configurations on specialty construction projects.Project management software — use digital scheduling tools to track task completion, material usage, and progress against project timelines on commercial construction assignments.Safety leadership — enforce scaffold, stilts, and PPE protocols for the entire taping team, conducting informal hazard assessments at the start of each elevated-work session.
advanced
Crew direction — lead a team of tapers across multiple simultaneous projects, assigning tasks based on skill level and project demands to meet general contractor deadlines.Quality standards — establish and enforce finishing quality benchmarks for the entire taping operation, reviewing completed work against Level 4 and Level 5 finish specifications on high-end commercial interiors.Training and mentorship — demonstrate advanced taping, floating, and sanding techniques to developing tapers, providing structured feedback that accelerates their progression toward journeyman level.Bid and estimating support — collaborate with project managers using project management and ERP software to estimate labor hours, material quantities, and scheduling requirements for large contract bids.Workflow optimization — redesign crew sequencing and drying-cycle scheduling across a multi-building commercial project to reduce total taping duration and material waste.Vendor and material management — evaluate compound brands, tape products, and equipment suppliers, recommending procurement decisions that balance cost, quality, and project schedule requirements.Organizational policy development — draft taping standards, safety procedures, and quality control checklists adopted company-wide to ensure consistency across all job sites.Stakeholder communication — present project progress, quality issues, and schedule risks to general contractors and owners, translating technical finishing concerns into clear business impacts.Performance management — assess individual taper productivity and finish quality, providing documented evaluations and development plans that align with company growth objectives.Industry knowledge leadership — stay current with new wallboard products, compound technologies, and building code requirements, integrating updated practices into company training programs and standard operating procedures.
Also known as
8 alternate job titles map to this occupation.
Drywall TaperTaperDrywall MechanicSheet Rock TaperDrywall FinisherFinisherWall TaperSpackler