National data — wages and growth are not published by state for this view.
Certification
Concrete Pump Operator
National Commission for the Certification of Crane Operators
Median earnings
—
Cost
—
Duration
—
Completion
—
Welcome to the CCO Concrete Pump Operator certification program. The CCO Concrete Pump Operator Task Force that developed this certification program was made up of experts from all aspects of the concrete pumping industry—management, pump driver and operators, trainers, and safety supervisors—who together represent many thousands of hours of pump-related experience.
Select required materials for the job site based on daily work needs and equipment requirementsSelect appropriate PPE according to job‑specific safety requirements and environmental conditionsGather personal provisions in anticipation of weather conditions, job duration, and number of poursPerform pre‑trip truck inspections (DVIR) using FMCSA requirements and observational skillsInspect pump components by checking safety pins, fluid levels, leaks, and stowed equipment during pre‑operational checksPlan travel routes by considering pump size, weight, permits, road restrictions, and traffic patternsDrive the concrete pump safely using defensive driving skills and minimizing distractionsFollow applicable driving laws based on federal, state, county, and city requirementsComply with FMCSA regulations by maintaining CDL documentation, medical card, and hours‑of‑service logsConsult with the pour supervisor to identify hazards, utilities, obstructions, and setup locationsVerify site conditions including soil stability, underground utilities, overhead hazards, and cleanout locationsPosition and level the pump by setting outrigger pads, conducting short‑rigging procedures, and following manufacturer guidelinesUnfold and inspect the boom while monitoring surrounding hazards and verifying necessary componentsInstall attachments safely by applying knowledge of installation procedures, weight limitations, and concrete weightGuide concrete trucks using communication, directional skills, and safe backing proceduresReview concrete mix details by confirming pumpability, batch time, and environmental conditionsMaintain communication with placement crews through hand signals, radios, or audible devicesControl boom and hose placement to prevent kinks, inspect joints, and manage system poursMonitor pumping conditions by managing flow, observing wind and ground conditions, and identifying blockagesConduct pump cleanout using the appropriate cleanout method, tools, PPE, and environmental requirementsExecute shutdown procedures in the correct sequence to ensure the system is fully clean and securedPlan return travel route by considering pump dimensions, weight, permits, and traffic conditionsPrepare for offsite cleanout by containing hopper materials and gathering necessary additivesPerform pre‑trip inspections through a full walk‑around to verify readiness for transportComplete offsite cleanout using correct cleanout methods, tools, and PPEDocument post‑trip inspections (DVIR) in compliance with DOT requirements and report maintenance needsPrepare equipment for the next day by refueling, topping off water, and charging remote batteriesPerform preventative maintenance on truck and boom following manufacturer and company specificationsComplete required paperwork including logbooks, inspection forms, timecards, and job‑specific documents